Project: JerAmyRV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeremy Williams   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:212.8
Start/Last Date:Feb 22, 2021 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=JerAmyRV-10

Home or Last Project Picture

Jan 11, 2022     Long time no post - HS spar work (so much deburring) - (3.5 hours)       Category: Tools
Well - it's been far too long since I've updated my build log - had a mix of a lot of holiday-prep and holiday relaxing. I got a few things done on the plane, which I still need to go update yet (will likely be short notes), but in the meantime - here's to hoping to getting back on track.

I'm currently on the Horizontal Stabilizer, working on the main spar. Started today's build session picking up on the end of page 8-5 - essentially, I had finished all of the drilling portions and just need to debur a whole bunch of holes. Once I had finished that, I was at the ‘prime' step - so I added those parts to my collection of ‘things ready to prime once it's not 5 degrees outside' stack. Currently, that pile includes: HS-1013, HS-1008 L/R, HS-1007, HS-1002, HS-906, HS-1003,

Then I pulled out all eight of the HS-1004 (inspar ribs for the HS). I trimmed the four of them as requested (2 cuts on all of them, and additional 2 cuts on the other two). Then went through the always tedious job of deburring all 8 of the flanges (combination of about 4-8 different files, scotchbrite pads (gray), and the scotchbrite wheels).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.